Critical Path Network Simulator

Fast-track zero-float activities to cut 2 weeks off the project per PMBOK 7

How to play

Fast-track zero-float activities to reduce the project duration by 2 weeks (14 days) without violating minimum durations. Adjust each activity's duration slider, then recalculate the critical path.

PMI PMBOK 7 — Schedule Performance

Drag these components onto the stage
AFoundation10d
BStructure15d
CMEP Rough-in20d
DFinishes12d
ECommissioning8d
A · Foundation10d
min 5dbase 10d
B · Structure15d
min 8dbase 15d
C · MEP Rough-in20d
min 10dbase 20d
D · Finishes12d
min 6dbase 12d
E · Commissioning8d
min 4dbase 8d
Total: 65d
Baseline 65d−0d savedTarget: −14d (2 weeks)