Place hardwood mat pads under all four outriggers to distribute ground pressure below soil bearing capacity, then position the crane pivot in the safe zone maintaining >6m clearance from overhead powerlines.
OSHA 1926.1408 / ASME B30.5 — Ground Bearing & Powerline Clearance