Back to All Tools

Crane Outrigger & Soil Placement Simulator

Top-down lift plan — mat outriggers and keep powerline clearance per OSHA 1926.1408

How to play

Place hardwood mat pads under all four outriggers to distribute ground pressure below soil bearing capacity, then position the crane pivot in the safe zone maintaining >6m clearance from overhead powerlines.

OSHA 1926.1408 / ASME B30.5 — Ground Bearing & Powerline Clearance

Drag these components onto the stage
Hardwood Mat PadHardwood Mat Pad
Crane Placement PivotCrane Placement Pivot
⚡ Powerlines
Uncompacted trench slope
Outrigger TL
Outrigger TR
Outrigger BL
Outrigger BR
Safe Zone (>6m from powerlines)
Near Powerlines (<6m)
Free Skilljet Resource

Preparing for your official certification? Practice with Skilljet's full diagnostic question bank and code reference drawer.

Start Free 15-Question Diagnostic