How to play
Drag wall tie anchors to every lift (4m vertical spacing) and install diagonal braces. Then apply the 40-knot wind load to test structural stability.
BS EN 12811 — Temporary Works Equipment
Drag these components onto the stage
Wall Tie Anchor
Right-Angle Coupler
Diagonal BraceLift 1 (4m)
Lift 2 (8m)
Lift 3 (12m)
Lift 4 (16m)
Lift 5 (20m)
Bay 1 Brace
Bay 3 Brace