Scaffolding Structural Tie-In Simulator

Facade tie-in grid — place ties and braces, then apply 40-knot wind load per BS EN 12811

How to play

Drag wall tie anchors to every lift (4m vertical spacing) and install diagonal braces. Then apply the 40-knot wind load to test structural stability.

BS EN 12811 — Temporary Works Equipment

Drag these components onto the stage
Wall Tie AnchorWall Tie Anchor
Right-Angle CouplerRight-Angle Coupler
Diagonal BraceDiagonal Brace
Lift 1 (4m)
Lift 2 (8m)
Lift 3 (12m)
Lift 4 (16m)
Lift 5 (20m)
Bay 1 Brace
Bay 3 Brace