Saudi Aramco is the world's largest oil producer, and its projects demand strict compliance with SAES (Saudi Aramco Engineering Standards). If you're a QC inspector working in Saudi Arabia — on Aramco or any major project — you must know these standards. This guide covers every SAES a QC inspector needs, across all disciplines.
What Are SAES Standards?
SAES = Saudi Aramco Engineering Standards — the mandatory technical baseline for all Aramco projects. They are:
- Mandatory on all Aramco onshore and offshore projects
- Supplementary to international codes (ASME, API, ASTM, ACI, NACE)
- Stricter than the base code in most cases
- Auditable — non-compliance is a project hold point
Every QC inspector on an Aramco project must know which SAES applies to their discipline and how it changes the inspection requirements.
The Overarching Quality Standard: SAES-Q-001
SAES-Q-001 is the Engineering Standard for Quality — it applies to every discipline and sets the QA/QC framework:
| Requirement | Detail |
|---|---|
| QA/QC plan | Mandatory for all projects |
| ITP | Required for all works, with hold/witness/review points |
| Traceability | All materials via MTC and heat number |
| Third-party inspection | Required on critical structural and pressure elements |
| Records retention | Project life + 10 years |
| Audits | Internal and external (Aramco audit) |
Every Aramco QC inspector must know SAES-Q-001 — it's the foundation.
SAES Standards by Discipline
Welding: SAES-W-011
SAES-W-011 is Aramco's Welding Standard. Key QC requirements beyond ASME B31.3 / Section IX:
| Area | Requirement |
|---|---|
| NDT extent | Often 10–20% RT (vs 5% B31.3 minimum) |
| PWHT | Mandatory at lower thickness thresholds |
| Hardness | Sour service per NACE MR0175 (≤22 HRC) |
| Welder requalification | Aramco-specific materials and positions |
| Documentation | Welding maps, welder logs, NDT reports |
| NDT personnel | Certified to ASNT SNT-TC-1A or ISO 9712 |
Coating & Painting: SAES-H-001
SAES-H-001 is Aramco's Coating Standard. Key QC requirements:
| Area | Requirement |
|---|---|
| Surface prep | Minimum Sa 2.5 (SSPC-SP10) for external steel |
| Inspector qualification | NACE/AMPP CIP Level 2 minimum |
| DFT | Per system, SSPC-PA2 measurement |
| Holiday test | Mandatory on immersion and buried service |
| Environmental | Temp, RH, dew point recorded every shift |
| Chloride limit | Often <20 mg/m² (stricter than industry) |
Civil & Structural: SAES-C-001
SAES-C-001 is Aramco's Civil Engineering Standard. Key QC requirements:
| Area | Requirement |
|---|---|
| Concrete | Mix design approval, 28-day cube tests, third-party lab |
| Rebar | Mill test certificates, traceability, cover verification |
| Structural steel | AWS D1.1 fabrication, bolt torque, NDT per inspection level |
| Foundations | Geotech report, bearing capacity, as-built verification |
| Documentation | ITP, QA/QC plan, as-built drawings, material certificates |
Electrical & Instrumentation: SAES-E-001
SAES-E-001 is Aramco's Electrical Engineering Standard. Key QC requirements:
| Area | Requirement |
|---|---|
| Cables | Aramco-approved type, insulation resistance test |
| Earthing | Resistance <1 Ω, continuity verified |
| Hazardous areas | IEC 60079 compliance, Ex certification |
| Instrumentation | Calibration certificates, loop testing |
| Records | Calibration logs, test sheets, as-built loop drawings |
Mechanical & Static Equipment: SAES-M-001
SAES-M-001 is Aramco's Mechanical Standard. Key QC requirements:
| Area | Requirement |
|---|---|
| Pressure vessels | ASME Section VIII + Aramco additions |
| Tanks | API 650 fabrication, hydrotest |
| Rotating equipment | Alignment, vibration test, run-in test |
| Documentation | Manufacturer data report, as-built, test records |
The Aramco Inspection Workflow
Step 1: ITP Development
Every Aramco project requires an ITP that references:
- The applicable SAES standard
- The international code (ASME, API, ASTM, ACI)
- Hold (H), Witness (W), and Review (R) points
- Acceptance criteria
- Documentation required
Step 2: Material Approval
All materials must come from the Aramco-approved vendor list and have:
- MTC (EN 10204 3.1 or 3.2)
- Heat number traceability
- Compliance certificate to the SAES standard
Step 3: Inspection and NDT
- NDT extent per SAES (often stricter than the base code)
- NDT personnel certified to ASNT SNT-TC-1A or ISO 9712
- Calibrated equipment — calibration certificates in date
Step 4: Documentation and Handover
Aramco requires a complete QA/QC dossier at handover:
- ITP with all sign-offs
- NCR register and closure records
- NDT reports
- Material certificates
- As-built drawings
- Test reports (hydrotest, coating, electrical)
- Welder and NDT personnel certificates
- Aramco-specific forms (welding maps, welder logs)
Aramco vs ADNOC: Key Differences
| Aspect | Aramco (SAES) | ADNOC (AGES) |
|---|---|---|
| Naming | SAES-X-0XX | AGES-XX-0X |
| Scope | All disciplines | All disciplines |
| NDT extent | Often 10–20% | Often 10–20% |
| Inspector qualification | International cert + Aramco approval | International cert + ADNOC approval |
| Documentation | Full dossier + Aramco-specific forms | Full dossier |
| Vendor list | Aramco-approved | ADNOC-approved |
| Chloride limit (coating) | Often <20 mg/m² | Typically <50 mg/m² |
Both require dual compliance with the international code and the client standard.
Common Aramco Interview Questions
1. What SAES standards apply to your discipline?
Answer with the specific standard for your role — e.g., for a welding inspector: "SAES-W-011 for welding, SAES-Q-001 for quality, and SAES-H-001 for coating of welded structures."
2. How does SAES-W-011 differ from ASME B31.3?
"SAES-W-011 supplements B31.3. It increases the minimum NDT extent from 5% to 10–20%, mandates PWHT at lower thickness thresholds, requires hardness testing for sour service per NACE MR0175, and adds Aramco-specific documentation like welding maps and welder logs."
3. What is the chloride limit for surface preparation on Aramco projects?
"Per SAES-H-001, the chloride limit is typically <20 mg/m², measured by the Bresle patch method (ISO 8502-6). This is stricter than the industry standard of <50 mg/m²."
4. What documentation is required at Aramco project handover?
"A complete QA/QC dossier: ITP with sign-offs, NCR register, NDT reports, material certificates with heat traceability, as-built drawings, hydrotest and coating reports, welder/NDT personnel certificates, and Aramco-specific forms like welding maps and welder logs."
Final Tips for Aramco QC Interviews
- Know your SAES standard number — interviewers will ask
- Understand how SAES supplements (not replaces) the international code
- Be ready to explain the ITP and hold points
- Mention the Aramco-approved vendor list
- Carry your international certification (CSWIP, AWS, API, NACE, ACI)
- Be ready for documentation questions — Aramco is documentation-heavy
- Know SAES-Q-001 — it's the foundation for every discipline
Practice Aramco SAES Questions with SkillJet.co
SkillJet.co's QC Inspector Simulator includes:
- ✅ All 6 QC disciplines with Aramco SAES overlays
- ✅ Code-based inspection scenarios with SAES-specific requirements
- ✅ ADNOC AGES overlays for comparison
- ✅ Real-time readiness scoring
Frequently Asked Questions
What are Saudi Aramco SAES standards?
SAES (Saudi Aramco Engineering Standards) are the mandatory technical standards governing all engineering and construction work on Saudi Aramco projects. They cover quality (SAES-Q), welding (SAES-W), coating (SAES-H), civil (SAES-C), electrical (SAES-E), and all other disciplines. They supplement international codes like ASME, API, and ASTM.
What SAES standards must a QC inspector know?
Key SAES standards: SAES-Q-001 (quality), SAES-W-011 (welding), SAES-H-001 (coating), SAES-C-001 (civil/structural), SAES-E-001 (electrical), and SAES-M-001 (mechanical). Every Aramco QC inspector must know the SAES for their discipline plus SAES-Q-001 (the overarching quality standard).
How do Aramco SAES standards differ from international codes?
SAES standards supplement international codes with Aramco-specific requirements — stricter NDT extents, mandatory PWHT at lower thresholds, Aramco-approved vendor lists, additional documentation (welding maps, welder logs), and third-party inspection on critical elements. Compliance with both the code and the SAES is mandatory.
How do I get Aramco-approved as a QC inspector?
Aramco approval requires: relevant international certification (CSWIP, AWS CWI, API, NACE/AMPP, ACI), demonstrated oil and gas experience, company sponsorship by an Aramco-approved contractor, and registration through Aramco's vendor/inspector qualification process. Some disciplines require Aramco-specific training.